Deutsch | Sitemap | Contact | Information material | Imprint     print page
Home
Company
Portrait Technologies Research Services Quality Employees Locations Chronicle Management Contact
Markets and products
Non-Ferrous Metallurgy Chemistry / FCC Iron and Steel Cement Glass Process Automation Spare parts References Locations Contact
Career
Working at GEA Bischoff Job market Placements and Internships FAQ for students Contact

Company

Portrait

Technologies

Research

Services

Quality

Certificates

Employees

Locations

Chronicle

Management

Contact

Markets and products

Non-Ferrous Metallurgy

Chemistry / FCC

Iron and Steel

Cement

Glass

Process Automation

Spare parts

References

Locations

Contact

Career

Working at GEA Bischoff

Job market

Placements and Internships

FAQ for students

Contact

Welcome to GEA Bischoff

We make clean air for everyone

With our process industry know-how, global capacities and widespread technologies, we are more than happy to be your partner.

We will look after all your production needs – you can rely on us!

All our customers are looked after personally and comprehensively – as a result, we are constantly being recommended from one customer to another.


GEA Bischoff at present

GEA Bischoff got the order for 4 Converter-off gas-cleaning systems from Handan Steel/China.

GEA Bischoff received orders from Handan-Steel for Engineering as well as delivery of special parts including automation system for waste gas cleaning and energy-recovery of all in all 4 converters for steel production according to the Lurgi-Thyssen (LT) Steel Gas process. The decision was mainly influenced by the advanced technology compared to the competition.


Successful start up and commissioning of an Electro-Precipitator for cleaning the sinter-cooler exhaust air for CORUS in Ijmuiden/Netherlands.

The gas cleaning plant was handed over after successful tests to the client. The dust load of the cleaned air is smaller than 20 mg/Nm3.


GEA Bischoff received an order from TKS for improvement of the dedusting efficiency of 3 electrostatic-precipitators for sinter-roomdedusting.

The order includes the improvement off the efficiency of 3 existing ESP. This will be achieved by installing 3-Phase-high-voltage-rectifier sets.

Enlargement of the ESP collection surface is with this technology not necessary.


Gas cleaning system for 3 container glass furnaces in California

GEA Bischoff Inc., Memphis got the order for the installation of 3 gas cleaning system in the new glass factory of Owens Illinois in Tracy, California. Helpful were the good experiences from the reference plant commissioned in the previous year at the customer Guardian Industries in Kingsburg.


Wet Gas Electrostatic Precipitator for Titanium Dioxide Industry

In November 2009 GEA Bischoff received an order for wet gas electrostatic precipitator for cleaning the off-gases of a TiO2 kiln from dust particles and acid mist. The Czech client Precheza a.s. located in Prerov is an important and the biggest producer of inorganic chemical products in the Czech Republic.


Complete gas cleaning system for float glass furnace in Italy

GEA Bischoff SpA, Milan got the order for the complete gas cleaning system to be installed in the new glass factory of Sangalli Group located in North-East of Italy. The gas cleaning unit mainly consists of a reactor for dry SOx-removal, electrostatic precipitator for reducing particulates and selective catalytic reactor for NOx removal.


New equipments in MISR Beni-Suef Cement Co. successfully started

GEA Bischoff SAS, Bordeaux has successfully started new equipments in MISR Beni-Suef Cement Co., Egypt. The line consists of kiln, bypass and clinker cooler electrostatic precipitators associated with 2 evaporation coolers. More than ten Egyptian cement plants are now equipped with GEA Bischoff electrostatic precipitators / evaporation coolers.


CODELCO placed the order for 2 wet gas electrostatic precipitators

GEA Bischoff received the order for 2 wet gas electrostatic precipitators (WESP) from CODELCO in Chile. CODELCO is the biggest producer of copper in the world. In the last 30 years GEA Bischoff has supplied different kind of gas cleaning equipment to CODELCO, among others 40 WESPs. The new precipitators will be installed in CODELCO’s sulphuric acid plant in Las Ventanas.


Long term excellent relationship with Cristalerias continued by new order

GEA Bischoff received the order from Cristalerias in Chile for a gas cleaning plant in the off-gas cleaning from 4 glass melting furnaces. The off-gas cleaning plant consists mainly of a reactor for dry SOx-removal, ESP for reducing particulates and a selective catalytic reactor for NOx removal. This order continues the long term excellent relationship.


Modernization of LT-plants No. 4+5 at Baosteel Shanghai

In August 2009 Baosteel signed the acceptance certificates for their revamped and modernized LT-plants No. 4+5 after completion of all commissioning activities and successful proof of guarantees. The gas cleaning performance of the plants for all phases of converter operation has been demonstrated during extensive emission measurement campaigns.


Emission Control System for the combined cleaning of exhaust gas downstream float glass furnace successfully handed over to a client in the USA

GEA Bischoff, Inc. successfully handed over a gas cleaning system for the combined removal of fine dust, SO² an NOx from an off gas of a float glass furnace to an American glass producer. The air pollution control (APC) equipment consists of a dry sorption of SO², an electrostatic precipitator for removal of fine dust and a SRC unit for reduction of NOx. As proved by performance tests and emission measurements, the APC plant fulfills the stringent emission control regulations of the state California/USA.


Further order from Sterlite Industries (India) Ltd.

From Vedanta Sterlite Industries (India) Ltd., India's largest non-ferrous metals and mining company, GEA Bischoff received an order for supply of two wet gas electrostatic precipitators. The precipitators are part of the process gas cleaning plant of a copper smelter in Tuticorin, India. Since 2001 GEA Bischoff has already supplied 9 wet electrostatic precipitators for this smelter.


Gas Cleaning Plant successfully taken into operation at the Spanish Copper Producer Atlantic Copper S.A.

In August 2009 GEA Bischoff GmbH successfully and on schedule has taken into operation a wet gas cleaning plant downstream the anode furnace at the copper smelter of our client Atlantic Copper S.A. in Huelva/ Spain. This gas cleaning plant was fully designed according to the requirements of state-of-the art gas cleaning technology for the removal of emissions from an anode copper converter.


Monitoring audit according to DIN EN ISO 9001:2000 and SCC** successfully completed..

In May 2009 the second monitoring audit by TÜV Rheinland according to DIN EN ISO 9001:2000 and SCC** took place.

It was confirmed that GEA Bischoff developed and established an effective system to the fulfillment of its politics and goals with it all requirements of the standards are fulfilled.


New order from Korea Zinc Co.

On April 20th 2009 GEA Bischoff received an order for 1 horizontal dry electrostatic precipitator from Korea Zinc Co. Ltd. The off-gases from a new lead smelter in Onsan, South Korea will be cleaned.

With this contract Korea Zinc Co. Ltd. continuous the longtime cooperation with GEA Bischoff, who since the year 1993 supplied 11 dry and 20 wet precipitators as well as various other gas cleaning equipment to this client.


Preliminary certificate for a new gas cleaning plant for AGC Flat Glass

GEA Bischoff SAS has successful commissioned a new Gas Cleaning Plant for AGC Flat Glass in Boussois/Line 1, France. The preliminary acceptance certificate was signed right after start up. This new system is the second installed in Boussois after the one including a SCR plant started in 2006. The new Gas Cleaning Plant is one of the first on a oxyfuel float furnace.


GEA Bischoff got the contract for a Dry Horizontal Electrostatic precipitator from Corus Staal BV.

GEA Bischoff installs turnkey for Corus Strip Products in Ijmuiden/Holland an ESP for cleaning the exhaust air from a sinter cooler. The highlights of the system are low maintenance and low energy consumption as well as high efficiency.


Gas taken over successfully at VALE INCO’s Thompson Smelter

Beginning Feb. 2009 the gas was successfully taken over by 2 hot gas electrostatic precipitators at a copper smelter in Manitoba. The plant is located approx. 300 km southeast of the Hudson Bay in Northern Canada. The plant’s erection in large part had to be done under extreme minus temperatures of minus 30 partially even down to minus 40 °C. Accordingly logistics as well as operational procedure often turned out to become a real challenge.


GEA Bischoff received an order for two LT-plants from Baosteel Meishan

GEA Bischoff delivers to Baosteel Shanghai at the production site Meishan engineering, special parts and automation control systems for gas cleaning plants behind two 250 t converter lines. Two LT (Lurgi-Thyssen) plants will be delivered for dedusting of the carbon monoxide laden gas using a four-field round-type electrostatic precipitator with a switch-over station for gas extraction. The main advantage of the LT process is the low energy demand and additionally the very low residual outlet dust concentration.



Technologies

The Emission Control Division of GEA offers tailored system solutions directly to producers and general contractors.

Job center

Find your dream job! In our job center.

Employees

Our employees are proud of everything that they do.

Quality

We perform our services quickly and reliably drawing on a quality policy which is based on five guidelines


Tuesday, 09.02.2010
GEA Division
Emission Control
our holding company
GEA
www.geagroup.com
Search:
GEA News
Jan 14, 2010 | GEA expands financing base Dec 18, 2009 | Niels Graugaard to continue as Executive Board member until 2013 Dec 16, 2009 | GEA supplies Air Cooled Condenser worth EUR 10m to Israel